Engineering
Expert Engineering Enables Long-Lasting, Money-Saving Performance

Smart,
coordinated engineering and design is not only the essential enabler
for the other “E’s” of High-Performance Roofing, it is the key to what
the Department of Energy calls “whole-building design,” which
integrates all the subsystems and parts of the building to work more
effectively together from “cradle to cradle.”
Stringent
measures help ensure that the highest level of quality control is
implemented throughout the manufacturing process. From raw material
selection to job site delivery, at least 14 different Duro-Last
personnel inspect, evaluate, and qualify the materials and processes
that are used to produce the Cool Zone roofing system.
Every
Cool Zone roof is engineered as a completely integrated system,
prefabricated to the exact measurements of each building. Not only is
up to 85 percent of membrane seaming completed in a factory-controlled
environment, roof stacks, flashings, and edge details are also
completed at the factory and shipped to the building site as part of
the complete roofing system. The few remaining seams are then hot-air
welded on-site by an approved contractor and inspected by a Duro-Last
technical representative before a warranty is issued.
Thanks
to the precision fabrication of the Cool Zone roofing system,
installation is much faster and less disruptive than for a typical
“roll-goods” roof. The installation process is quiet, with no noxious
fumes or flames, so building occupants can continue with their regular
routines.